# Drone Operator Policy Evidence Checklist

Use this checklist to prepare a factual FCC filing, agency declaration, legislator brief, trade-group submission or client-risk memo.

## 1. Identify the exact policy action

- FCC docket and notice number
- For the principal military-grade UAS proposal, identify both **PS Docket 26-189** and **DA 26-758**; 26-189 is the docket, not an FCC order number
- Comment or reply deadline, verified in the live docket
- Exact aircraft model, FCC ID, payload, controller, dock or component affected
- Proposed capability category, such as thermal, LiDAR, docking, dispersal, swarming or 55-pound weight
- Official sensing specification saved with the filing; distinguish LiDAR from vision, infrared and time-of-flight obstacle sensing
- Separate FCC import and marketing consequences from federal procurement, funding and fleet rules

## 2. Inventory the operating stack

- Aircraft count, models and purchase dates
- Payloads and sensors
- Controllers, batteries, chargers and docks
- Software subscriptions, integrations and data workflows
- Remaining service life and current replacement availability
- Current resale, repair, parts and warranty constraints

## 3. Document missions, not preferences

- Mission types and annual frequency
- Response-time or launch-time requirements
- Thermal, optical, mapping, LiDAR, RTK, night and wind requirements
- Accuracy, endurance, communications and GNSS-denied requirements
- Clients, agencies or infrastructure served, without exposing sensitive details
- Consequence if the mission is delayed, reduced or unavailable

## 4. Price the full transition

- Comparable configured aircraft quote
- Payload, controller, battery, dock and accessory costs
- Software licensing and data-migration costs
- Training and certification time
- Maintenance, warranty and parts availability
- Procurement lead time
- Expected downtime, lost work and contract risk

## 5. Compare alternatives fairly

- Same mission and environment
- Same payload function and configuration
- Same software and support assumptions
- Demonstrated field result, not only a specification sheet
- Security controls and network behavior for every vendor
- Current authorization or cleared-list status for the exact system, payload and configuration
- Every open manufacturer notice, required software version, hardware revision and mitigation
- Exposure-normalized reliability and incident reporting for every vendor; operator-group accounts are leads to verify, not rates
- Repair network, delivery time and five-year total cost

## 6. Document a grounded, restricted or retired fleet case

- Agency and program that owns the aircraft
- Exact legal or funding lane: federal-aid restriction, federal procurement, state procurement, state operation rule or local policy
- Aircraft restricted on specific projects versus grounded for all missions
- Original aircraft count, active count and affected count
- Original purchase value, book loss, replacement quote, appropriation and reimbursement recorded as separate measures
- Date the restriction began and expected downtime
- Missions delayed, transferred, reduced or cancelled
- Current public source or signed agency declaration

Do not combine unlike agency snapshots into a state or national total. A state transportation response, a local police fleet and a replacement appropriation answer different questions.

## 7. Propose a measurable remedy

- Model-specific scope or clarification
- A published consumer and enterprise model matrix for each capability category
- Mission-specific carve-out
- Transition extension tied to documented replacement availability
- Bridge or replacement funding
- Local or offline operating mode
- Independent security validation
- Comparable government field testing and public results

## 8. Protect the record

- Cite primary sources
- Label estimates and owner-reported data
- Avoid unsupported national market-share or cost claims
- Do not allege corruption or causation without evidence
- Remove tactical locations, vulnerabilities and personally identifiable information from public filings

## Direct action links

- FCC standard filing: https://www.fcc.gov/ecfs/filings/standard
- ET Docket 26-22, DJI OnDefend assessment: https://www.fcc.gov/ecfs/search/search-filings/results?q=%28proceedings.name:%28%2226-22%22%29%29
- PS Docket 26-184, previously authorized named covered equipment: https://www.fcc.gov/ecfs/search/search-filings/results?q=%28proceedings.name:%28%2226-184%22%29%29
- PS Docket 26-189, military-grade capability categories including LiDAR: https://www.fcc.gov/ecfs/search/search-filings/results?q=%28proceedings.name:%28%2226-189%22%29%29
- ET Docket 21-232, production-location definitions: https://www.fcc.gov/ecfs/search/search-filings/results?q=%28proceedings.name:%28%2221-232%22%29%29
- DHS NUSTL results request: NUSTL@hq.dhs.gov
- DHS FOIA: https://www.dhs.gov/foia
- Oregon aviation 25-state fleet-impact paper: https://www.oregon.gov/aviation/agency/about/Documents/Press%20Releases/White_Paper_Impacts_Federal_Restrictions_On_State_UAS_Programs.pdf
- Skydio Notices to Operators: https://support.skydio.com/hc/en-us/sections/20862493496347-Notices-to-Operators
- DIU Blue UAS cleared list: https://www.diu.mil/blue-uas-cleared-list
- Find members of Congress: https://www.congress.gov/members/find-your-member
- Find state and federal officials: https://www.usa.gov/elected-officials/

Evidence cutoff for the companion investigation: August 10, 2026. Verify live deadlines before filing.
